Products
Double-Station Winding Equipment

Double-Station Winding Equipment

The AUGU Double-Station Winding Equipment is a specialized non-standard machine designed for the rubber industry to enhance the efficiency of tyre semi-finished product winding processes. With dual workstations, it ensures continuous operation of the cooling line, significantly improving work efficiency.

The AUGU Double-Station Winding Equipment is engineered to meet the specific needs of winding and handling tyre semi-finished products in the rubber manufacturing process. This non-standard equipment is customizable to accommodate various tyre sizes and production line requirements, offering a seamless and efficient winding solution.

Parameter Of AUGU Double-Station Winding Equipment

WIND STATION

2

CORD WIDTH

450

LINER CLOTH ROOL DIAMETER

Φ300

POWER

1.5KW

WEIGHT

1500KGS

Features Of AUGU Double-Station Winding Equipment

■ Double Workstations: Ensure continuous winding operations without downtime.

■ Customizable Design: Adaptable to various tyre dimensions and production specifications.

■ Efficient Material Handling: Specifically designed for tyre semi-finished products.

■ Padding Integration: Compatible with padding materials for quality assurance.

■ User-Friendly Control System: Simplified operation for production line workers.

■ Safety Interlocks and Guards: Protect workers and maintain safe operation standards.

Application Of AUGU Double-Station Winding Equipment

■ Tyre Semi-Finished Product Winding: For post-processing of tyre semi-finished products.

■ Cooling Line Integration: To maintain the efficiency of the tyre cooling process.

■ Rubber Manufacturing: Suitable for various rubber product manufacturing workflows.

Why choose us?

Select the AUGU Double-Station Winding Equipment for its efficiency, customization, and commitment to safety. Our non-standard equipment is designed to meet the unique demands of your tyre winding process, offering a solution that boosts productivity without compromising on quality. We focus on delivering machinery that integrates seamlessly into your existing production lines and exceeds industry standards.

Key operation steps of AUGU Double-Station Winding Equipment

1. Pre-Configuration: Set up the equipment according to the tyre dimensions and production requirements.

2. Safety Check: Ensure all safety features are operational before starting the process.

3. Material Loading: Load the tyre semi-finished products onto the winding stations.

4. Initiate Winding: Start the winding process, ensuring the product is correctly positioned with padding.

5. Dual Station Operation: Utilize the double workstations for continuous winding without interruptions.

6. Quality Inspection: Conduct inspections to confirm the winding quality and padding integration.

7. Unloading: Safely remove the wound tyre products from the workstations for further processing.

8. Post-Operation Maintenance: Perform routine maintenance checks to ensure the equipment remains in optimal condition.

Hot Tags: Double-Station Winding Equipment, China, Manufacturer, Supplier, Quality, Factory, Price, Advanced, Quotation
Send Inquiry
Contact Info
For inquiries about rubber mixing process, tire building process, rubber equipment or price list, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept